This document specifies TXE2 exchange equipment commonly referred to as AT 71200 which was first used on MK1 exchanges. The circuit consists of 1 unit and is constructed to T11000 equipment practice. The circuit is described as a Subscribers Line Circuit and 'A' Switch.
2. DOCUMENTATION.
2.1 Contractual Documentation. In addition to this specification the
following documents shall de·termine the Post Office requirements for manufacture
and supply purposes.
2.1.1 Unit 1.
ITEM DOCUMENT CONTENT ISSUE CONTROL SIZE PURPOSE
01 700801/S PTL Circuit Diagram 3A PTL,R A1 C,M
02 700801/W PTL Physical Layout 07 PTL,R A1 C,M
03 700801/U PTL Upt Layout 09 PTL,R A3 C,M
ISSUE: P = Provisional;
CONTROL: D = On file for distribution; R = Restricted; U = Unsuitable
SIZE: Ax = Isometric size; I = Imperial; M = Microfilmed
PURPOSE: C = P&S Contractual; S = Service; M =Manufacture; I = Information
Line 1-5 : for connection to subs telephone A, B and Meter - Do i need to connect anything to Meter wire ?
A Switch Outlet A-E : for connecting to B switches - ABPH, where P is meter H is signal for holding path through Crosspoint switch relays. - for my TXE2 I only have 1B switch and 2 subs cards - so how do i connect ?
MK1 - MK5 : Input : Mark signal for each subs line - connects KT(A) & KT(B) to 'marked' sub
KT- K Test: Output: - enables call control to know state of line selected by MK signal above
Free - 530 ohms to -48v ( 530 is 1.5k and 820 ohms in parallel)
Parked - 1.5k ohms to -48v
Busy - earth ( when K relay is energised by P signal)
PN -Output ? to A pattern relay - a -ve battery signal output is sent to the APR
N1 and NE are used to send a current pulse through the CNG field, to signal to the control circuits that Line 1 has gone off hook.
N2 and NE are used to send a current pulse through the CNG field, to signal to the control circuits that Line 2 has gone off hook
N3 and NE signal line 3 has gone of hook
N4 and NE signal line 3 has gone of hook
N5 and NE signal line 3 has gone of hook
Purple - A1 -50v pwr
Grey/Red -A2
NOT FITTED
NOT FITTED
Wht/Ora- A5 - Earth pwr
Gry/Brwn- A6 -
NOT FITTED
NOT FITTED
A9 +50v pwr
A10
NOT FITTED
NOT FITTED
red- A13 - frame eth
GRN/RED -A14 -
NOT FITTED
NOT FITTED
Operates the MKR relay when pulled to